Industry consulting

EV Charging and Mobility Consulting

Electrification is an infrastructure and energy cost project first.

Plan charging businesses and electrified fleets with realistic utility, permitting and incentive assumptions.

6Scope areas
4Roadmap phases
5Metrics managed
6Deliverables
Key metricCharger utilization

Share of time a charger is delivering energy.

Roadmap
  1. Diagnose
  2. Structure
  3. Launch
  4. Optimize
Overview

Overview

Electric mobility creates opportunities in charging, fleet conversion, shared mobility and services. The economics depend on site selection, utility interconnection, electricity rate structure, equipment reliability and utilization, details that are often underestimated at the outset.

We help you evaluate whether and where to participate, model the business honestly, and sequence permitting, utility engagement, equipment selection and operations.

Who this is for

  • Entrepreneurs evaluating a charging station business
  • Property owners and retailers considering hosting chargers
  • Fleet operators assessing electric vehicles
  • Mobility startups planning pilots
Scope

What we deliver

Business model selection

Own and operate, host owned, charging as a service or depot charging for fleets, with revenue and risk by model.

Site selection and utility review

Traffic and dwell time analysis, available power capacity, interconnection timelines and upgrade costs.

Financial and tariff modeling

Demand charges, time of use rates, session pricing, utilization ramps and equipment replacement.

Equipment and network selection

Charger power levels, connector standards, network and payment platforms, uptime and support terms.

Fleet electrification planning

Route and duty cycle suitability, vehicle choices, depot design and total cost versus combustion.

Incentive and funding research

Identifying current federal, state and utility programs and their conditions.

Compliance

Licensing and compliance considerations

Requirements vary by state and locality and change over time. We confirm each item with the issuing agency before you file.

  1. Permitting and electrical codes

    Local building and electrical permits, inspections and licensed electrical contractors.

  2. Utility agreements

    Service upgrade requests, rate class selection and any make ready programs.

  3. Accessibility and signage

    Accessibility requirements for public charging and required signage.

  4. Pricing and metering rules

    States differ on how electricity can be sold and measured, including per kilowatt hour pricing and consumer disclosures.

  5. Incentive conditions

    Incentives have changed materially and some federal credits have expired, so we verify the current status and eligibility before they enter any model.

Roadmap

Roadmap

Four phases, from Diagnose to Optimize.

  1. Phase 1

    Diagnose

    • Opportunity and model screening
    • Preliminary site and utility review
    • Go or no go analysis
  2. Phase 2

    Structure

    • Detailed financial model
    • Equipment and network selection
    • Permitting and utility plan
  3. Phase 3

    Launch

    • Installation oversight
    • Pricing and payment setup
    • Listing and launch marketing
  4. Phase 4

    Optimize

    • Utilization and tariff review
    • Uptime and maintenance management
    • Additional site pipeline
Metrics

Metrics we manage

5Metrics
  1. Charger utilization

    Share of time a charger is delivering energy.

  2. Revenue per charger per day

    Net session revenue after payment fees.

  3. Energy cost per kilowatt hour delivered

    Including demand charges, the factor that most often surprises new operators.

  4. Uptime

    Share of time chargers are available and functioning.

  5. Fleet total cost of ownership

    Per mile, including vehicles, energy, maintenance and charging infrastructure.

Avoid

Mistakes we help you avoid

  • Selecting sites on traffic alone, without checking power capacity
  • Ignoring demand charges when setting prices
  • Counting on incentives that have expired or are oversubscribed
  • Buying equipment without service and uptime commitments
  • Converting a fleet without a duty cycle analysis
Receive

Deliverables

  • Opportunity screening memo
  • Site and utility assessment
  • Financial model with tariff scenarios
  • Equipment and network comparison
  • Permitting and project timeline
  • Fleet electrification roadmap
FAQ

Questions

Still have a question?

Talk to us directly. We will tell you plainly whether we are the right fit.

Some are, many are not. Results depend on location, power cost and utilization. We model the downside before you commit.

For some duty cycles yes. We test routes, charging windows and cost before purchase.

No. We plan, specify and oversee, and licensed contractors install.

Next step

Plan this business with us.

Book a consultation and we will confirm the licensing path, the numbers and the scope for ev charging and mobility consulting.

This page is general information about our advisory services. It is not legal, tax or insurance advice, and requirements depend on your jurisdiction and facts.